Chapter 8: Installing, Removing, and Replacing Components
Removing and Replacing the Chassis
212 Quantum Scalar i40 and Scalar i80 User’s Guide
Figure 51 Reinstalled
Components
Ethernet
cable in LEFT
SCB port
Tape drive cables
Power supply
cord
13 Turn ON the library by pressing the power button on the front
panel.
14 W
ait for the library to initialize. This can take up to 5 to 17 minutes,
depending on library size.
15 Y
ou will notice the library has a new diagnostic ticket (DT042)
stating the library’s vital product data (VPD) has changed.
16 Reconf
igure host applications to support the new library VPD (serial
number, WWNN, and drive addresses).
17 If
you had license keys installed on the old library, install the new
license keys. From the operator panel, select Setup > License
Installation; or from the Web client, select Setup > License. For
further directions, see
Applying a License Key on page 70.
18 Run
the Installation and Verification Test (IVT) to ensure the robot,
tape drives, and magazines are all functioning properly. From the
Vue de la page 237