Quantum DLT 8000 Manuel Page 60

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 408
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 59
Configuring, Installing, and Operating the Tape System
2-6 Quantum DLT 8000 Tape System
2.2.2 Setting TERM PWR
A SCSI bus must be terminated at each end of the bus. At least one device on the bus
must supply terminator power (TERM PWR).
To configure the DLT 8000 tape drive to supply TERM PWR, install a jumper block on
pin pair 3 / 4 (Figure 2-2).
Figure 2–2 Jumper Installed on Pin Pair 3 / 4 Enables Termination Power (TERM PWR)
Jumper on Pin Pair 3 / 4 enables
termination power (TERM PWR).
Front Bezel
Side View of Tape System
Vue de la page 59
1 2 ... 55 56 57 58 59 60 61 62 63 64 65 ... 407 408

Commentaires sur ces manuels

Pas de commentaire