
Chapter 2 Installing the P1000 Library
Unpacking the P1000
ATL P1000 Series User’s Guide 17
Unpacking the P1000
2
This section explains how to receive and unpack the P1000.
Note:
If you have already unpacked the library following the procedures in
the
ATL P1000 Series Unpacking Instructions
, skip ahead to “Preparing
and Inserting Tape Cartridges” on page 30.
This procedure consists of the following steps:
•
receiving the library from the shipper
•
uncrating the library
•
checking the contents of the shipping carton and accessories tray
•
installing the slide assembly in the rack (rack-mount library only)
•
removing the library from the pallet
•
removing the internal packing materials from the library
Note:
Before performing the procedures in this section, verify that the
installation site meets the requirements listed in “Site Requirements”
on page 14.
Unloading Space
Requirements
2
Before uncrating the library, verify that you have sufficient space. For
the stand-alone unit, allow a minimum of six feet in front of the ramp
side of the pallet (see figure 12 on page 18).
Note:
Unpack the library as close to the installation site as possible.
Commentaires sur ces manuels