Quantum P1000 Guide de l'utilisateur Page 34

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 132
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 33
Chapter 2 Installing the P1000 Library
Unpacking the P1000
18 ATL P1000 Series User’s Guide
Figure 12 Unloading
Space Requirements,
Stand-alone Library
Uncrating the Library
2
To uncrate the P1000 library:
Note:
Be careful not to damage the shipping materials while uncrating the
library. Save all packaging materials for possible future shipment of
the library.
Procedure
1
Open the top of the shipping carton by carefully cutting the
packaging tape.
The following items are stacked on top of the P1000:
accessories tray
ramp (stand-alone library) or slide assembly (rack-mount
library)
Pallet
Pallet ramp
Library
Unloading area
(minimum)
30 in. (76 cm)
18 in. (46 cm)
33 in. (84 cm)
97 in. (2.5 m)
Vue de la page 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 131 132

Commentaires sur ces manuels

Pas de commentaire