Quantum Scalar i2000 Guide de l'utilisateur Page 443

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 544
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 442
Chapter 6 Maintaining Your Library
Maintenance Actions
Scalar i6000 User’s Guide 430
Deleting Scheduled Jobs 6
If you no longer need a scheduled job, delete it.
1 On
the menu bar, click Tools > Reports > Reporting Options.
The R
eporting Options dialog box appears.
2 Under Schedul
ed Jobs, click the job you want to delete, and then
click Delete.
A dialog box appears asking if you are sure you want to delete the
se
lected job.
3 Click Yes.
The job is deleted from the list of scheduled jobs.
4 Click Close to close
the Reporting Options dialog box.
Working With Verification
Tests 6
A collection of verification tests are available to assist you or a customer
service engineer (CSE) in determining whether the library is properly
installed, configured, and operational. Running the tests is an important
part of ensuring that the system is working correctly.
Because resolving an issue often involves complex
technical procedures, such as removing and
replacing FRUs, and because verification tests
often require preparation and trained
interpretation of results, it is recommended that a
CSE perform the tests.
There are three types of verification test that help diagnose problems with
the library:
Installation verification test
Partial system tests
FRU operation tests
The verification tests provide the following:
Fully automated tests
Tests to determine marginality of installation
Detailed problem analysis
Vue de la page 442
1 2 ... 438 439 440 441 442 443 444 445 446 447 448 ... 543 544

Commentaires sur ces manuels

Pas de commentaire